Skip to main content

Element79 Gold Corp Files NI 43-101 Technical Report for Elephant Project in Nevada's Battle Mountain District

Element79 Gold Corp.

Data support skarn/porphyry potential; drill-ready program outlined

VANCOUVER, BC - DECEMBER 16, 2025 – TheNewswire - Element79 Gold Corp. (CSE: ELEM) (OTC: ELMGF) (FSE: 7YS0) ("Element79", the "Company") today announced the filing of an independent technical report (the “Report”) prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) for its Elephant Project, located in the prolific Battle Mountain Mining District, Nevada.

The Report, authored by Steven L. McMillin, MSc, CPG, of Rangefront Mining Services, provides an integrated assessment of geology, geophysics, and the compilation and analysis of historical exploration data. Historical exploration on the property has identified multiple gold-bearing structures, surface sampling anomalies, and drill intercepts that indicate strong potential for both high-grade and bulk-tonnage gold mineralization. Previous work identified scattered mineralization in widely spaced holes that, when mineralized, suggest the presence of a larger system at depth. The current report outlines that additional drilling is warranted to evaluate skarn- and porphyry-style gold-copper mineralization.

Key Highlights from the Report:

  • The Elephant Project sits on the east-central flank of the Battle Mountain District, with year-round access and established infrastructure. 

  • Approximately 3,740 acres (1,514 ha) across 187 unpatented lode claims 

  • Historical Work:  

    • 32 drill holes totalling 11,868 m (38,937 ft) with 27 holes reaching bedrock 

    • Widespread basemetals anomalism and localized highgrade Au within skarn/hornfels near intrusive dikes. 

  • Notable Intervals (historic): 

    • EL04P3: 1.5 m @ 14.5 g/t Au, plus 1.5 m @ 1.735 g/t Au. 

    • 3C: 6.2 ft @ 7.70 g/t Au, plus multiple intervals between 0.59–1.60 g/t Au over 1–20 m. 

    • These intercepts occur within broader halos of base-metal enrichment (Cu, Pb, Zn), consistent with skarn/porphyry systems. 

(True widths unknown; all intercepts are historical and reported in the Report.)

  • GeophysicsDriven Targets:  

    • IP–Resistivity survey defines coherent chargeability anomalies interpreted as sulfides at depth, aligned with intrusive trends. 

    • Airborne magnetics show magnetitedestructive alteration consistent with porphyry systems.  

    • Priority drill intervals are outlined along four IP lines. 

“This Report further highlights the potential of the Elephant Project, supporting the Company’s intention to advance a systematic exploration program aimed at expanding on past work and unlocking the project’s full potential in a district that already hosts tier-one operations,” commented Michael Smith, CEO of Element79 Gold Corp. “With high-grade gold intervals reported in historical core and geophysical signatures consistent with sulfide mineralization, our focus is on smart meters that test the heart of this system.”


Click Image To View Full Size

Figure 1: Proposed drill targets

Next Steps:

  1. Legacy Core Program: Re-log, photograph, and digitize historical core; implement QA/QC check assays and petrography. 

  2. Geophysics Integration: Complete a property-wide ground/drone magnetics survey and extend IP coverage over remaining claims; merge historical gravity data with public datasets. 

  3. 3D Geologic Model: Build an integrated model combining structural, geochemical, and geophysical data to rank targets. 

  4. Drilling: Test IP chargeability corridors and the interpreted north‑northeast intrusive trend, stepping into Section 12 where multi‑element grades are highest. 

The full NI 43-101 report can be viewed on SEDAR+ here.

Qualified Person

The technical information in this release has been reviewed and approved by Kim Kirkland, Director of Element79 Gold Corp, Fellow of AusIMM #309585, and a "qualified person" as defined by National Instrument 43-101.

About Element79 Gold Corp. 

Element79 Gold Corp is a mining company focused on the exploration and development of its portfolio of high-potential gold projects. The Company’s focus is its Nevada portfolio, anchored by the Gold Mountain and Elephant Projects, both located in the world-class Battle Mountain Trend. In addition, Element79 continues to advance its high-grade Lucero Project in southern Peru, positioning the Company for long-term exploration growth.

For further details on this announcement and the Company’s projects, please visit www.element79.gold

Contact Information

For corporate matters, please contact:

Michael Smith, Chief Executive Officer

E-mail: ms@element79.gold

For investor relations inquiries, please contact:

Investor Relations Department

Phone: +1. (855) 535-3679

E-mail: investors@element79.gold

Cautionary Note Regarding Forward Looking Statements

This press contains "forward‐looking information" and "forward-looking statements" under applicable securities laws (collectively, "forward‐looking statements"). These statements relate to future events or the Company's future performance, business prospects or opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made considering management's experience and perception of historical trends, current conditions and expected future developments. Forward-looking statements include, but are not limited to, statements with respect to: the Company’s plans and intentions for further exploration at the Elephant Project, including proposed drilling programs, geophysical surveys, and geologic modeling; the timing, scope, and objectives of such programs; and the potential for mineralization and project development. Assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, forward-looking statements cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon forward-looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur. All statements other than statements of historical fact may be forward‐looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "forecast", "potential", "target", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward‐looking statements".

Neither the Canadian Securities Exchange nor the Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Copyright (c) 2025 TheNewswire - All rights reserved.

Recent Quotes

View More
Symbol Price Change (%)
AMZN  222.56
+0.02 (0.01%)
AAPL  274.61
+0.50 (0.18%)
AMD  209.17
+1.59 (0.77%)
BAC  54.81
-0.52 (-0.94%)
GOOG  307.73
-1.59 (-0.51%)
META  657.15
+9.64 (1.49%)
MSFT  476.39
+1.57 (0.33%)
NVDA  177.72
+1.43 (0.81%)
ORCL  188.65
+3.73 (2.02%)
TSLA  489.88
+14.57 (3.07%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.